
Moving into a new apartment is exciting, but residents face real risks if they accept possession before the developer secures the project’s Completion Certificate (CC) or Occupancy Certificate (OC). Without these documents the building is still technically under construction and the developer has not yet proven that it complies with safety and planning rules. Residents who occupy early often pay higher taxes, face difficulty getting permanent utilities, and even risk eviction by municipal authorities. Worse, the burden to chase paperwork and resolve compliance issues usually falls on the Management Committee (MC) after handover.
This article explains what CC and OC are, how they differ, why both matter for residents, the general rules across India, and state‑specific variations. Understanding these basics helps buyers and resident associations make informed decisions and avoid legal pitfalls.
Table of Contents
What do Completion and Occupancy Certificates mean?
Completion Certificate (CC)
A Completion Certificate is issued by the municipal or development authority after construction is finished. It confirms that the building was constructed according to the approved plans and complies with building bylaws. The CC must be obtained before an occupancy application is made. As the Brigade Group notes, a developer must obtain the CC after construction to confirm that it meets regulations; only after that can they apply for the OC.
Occupancy Certificate (OC)
An Occupancy Certificate certifies that the building is safe and fit for habitation. It confirms that the essential services—such as fire systems, water supply, sewerage, electricity, lifts and access—are in place. Without an OC, the law treats any occupation as illegal. According to the same source, the CC comes first and the OC follows; without the CC there can be no OC, and without the OC one cannot legally occupy the building.
How they differ
- Purpose: CC confirms completion as per sanctioned plans, while OC certifies that the property is ready for habitation.
- Issued by: Both are issued by the local authority, but the CC comes after construction completion and the OC after safety and utility checks.
- Legal effect: The CC allows legal sale and transfer of the property; the OC allows lawful occupation.
- Sequence: CC → OC. Occupation before OC can invite penalties or eviction.
Why are CC and OC essential for residents?
Residents who move in without these certificates face serious consequences:
- Higher costs and fines: Municipalities often levy higher property tax and water charges on buildings occupied without an OC. Temporary utility connections can be cut suddenly.
- Loan and insurance issues: Banks and insurers require a valid OC to finalise home loans and policies. Without it, loans may be withheld and insurance claims disputed.
- Legal vulnerability: Occupation without OC is illegal in many jurisdictions. Authorities can issue vacate notices, demolish unauthorised structures or deny permanent utilities. Developers who fail to obtain CC/OC may face penalties.
- Resale problems: Future buyers or lenders often ask for CC/OC; without them, selling or mortgaging your flat becomes difficult.
These risks explain why MCs should insist on valid certificates before taking handover. In our second article we’ll discuss how to mitigate these risks if the builder delays.
General rules that apply across India
- Never take possession without OC. Most municipal laws prohibit occupation without an OC. Utilities such as water, electricity or gas require an OC for permanent connections, and banks demand it for final loan disbursals. Move‑in before OC may be treated as illegal.
- Promoter’s responsibility under RERA. The Real Estate (Regulation and Development) Act (RERA) makes the developer responsible for obtaining CC/OC and handing them over to buyers or the association. Giving possession without an OC is considered a service failure and may attract fines or refunds.
- Maintenance charges cannot be collected before OC. Consumer forums have repeatedly held that builders cannot charge maintenance for periods prior to issuing OC. Until legal occupancy is permitted, the developer bears the risk and costs of early possession. More on maintenance billing is covered in Part 2 of this guide.
How state laws differ
Maharashtra
- Strict prohibition on occupation without OC: Municipal rules make it illegal to move in without the Commissioner’s consent. Authorities have issued vacate notices to buildings occupied without OC due to fire and structural risks.
- Developers bear outgoing costs: Builders cannot transfer flats without CC/OC and must bear outgoings (maintenance, taxes) until compliance. Resident Welfare Associations (RWAs) may seek reimbursement for extra taxes or water charges paid due to absence of OC.
Karnataka
- OC is mandatory: Apartments within Bruhat Bengaluru Mahanagara Palike (BBMP)/Bangalore Development Authority (BDA) limits must have an OC to be legally occupied. Past lax enforcement is tightening because utilities now require OCs.
- Small‑house exemption (2025): Individual houses on small plots or within specific height limits in Greater Bengaluru are exempt from OC requirements, but multi‑unit apartment blocks are not.
Tamil Nadu
- Completion certificate acts as OC: For large projects, the CC doubles as the occupancy permission. The certificate is issued after structural stability, fire safety and planning compliance are verified.
- Low‑rise exemption (2024 update): Small residential buildings under a defined height or unit count do not need a CC for utilities. Larger apartment complexes and high‑rise buildings must secure a CC/OC before occupation.
Delhi–NCR
- Backlog & partial OCs: Local authorities often grant partial OCs for completed towers or phases if common safety infrastructure is ready. This allows residents to occupy finished blocks while remaining phases finish. However, full OC remains the ultimate requirement.
- Verify tower‑wise: MCs should verify that their particular tower has an OC, not just rely on the project’s name. Authorities can deny utilities to towers without OCs.
When do CC/OC rules not apply?
- Small homes (Karnataka): Individual dwellings built on small plots/within height limits may be exempt from OC, though they still require approved plans and adherence to building codes. Apartments are not exempt.
- Low‑rise buildings (Tamil Nadu): Buildings under a certain height or with few units may obtain utilities without CC. High‑rises and multi‑unit complexes still need CC/OC.
- Partial Occupancy Certificates: Some states issue partial OCs for completed phases/towers when common safety systems like fire pumps and lifts are operational. This is a temporary permission and should not replace efforts to obtain full OC.
- Temporary NOCs (NCR): Draft regulations in parts of NCR allow temporary No‑Objection Certificates to ease buyer hardship. Treat these as interim fixes; full OCs are still mandatory.
Frequently asked questions
What’s the easiest way to distinguish between OC and CC?
Think of CC as “construction complete” and OC as “okay to occupy.” The CC certifies that construction follows the sanctioned plan; the OC confirms the building is safe for residents. Both are needed for legal living.
Can the builder charge maintenance before OC?
Usually not. Possession without OC is premature. Until the OC is issued and lawful occupancy begins, the developer must bear maintenance and common service costs.
Is it okay to move in with a partial OC?
Only if your specific tower or floor is covered and common safety systems (fire pumps, exits, alarms) are functional. Treat partial OC as temporary and continue pursuing full OC.
Are CC/OC always required for small buildings?
Some states exempt individual houses or low‑rise structures, but apartment complexes and high‑rises still need CC/OC. Always check the latest state notifications.
What if the builder doesn’t respond on OC?
Escalate through RERA or consumer forums. Document your communications, hire an independent architect/engineer to assess compliance, and work with neighbours to file formal complaints.
Can utilities be obtained without OC?
Some cities may grant temporary connections, but expect higher rates, delays and future enforcement actions. Securing a valid OC should be your priority.